Build & Test
Built to spec.
Proven to perform.
We assemble your machine in-house, integrate all subsystems and verify performance against your full specification — so you receive a system that has been validated, not just built.
01
Assembly & integration
02
System verification
03
Factory acceptance testing
04
Commissioning & handover
01.
Assembled in-house
Every machine is built and integrated by our own engineers — full control over quality from first part to final system.
02.
Validated against spec
Performance is verified against your full specification before delivery — no surprises during commissioning.
03.
From FAT to onsite SAT
Factory acceptance testing at our facility, followed by site acceptance testing — your machine is proven at every stage.
What we offer
SERVICES
01
Assembly & integration
We assemble your complete machine in-house, from the mechanics, motion system, electronics, cabling until the software, following controlled build procedures that trace every component to its specification.
Our engineers are involved from the design phase, so they know every detail of the system before it reaches the assembly floor. This continuity avoids the typical gap between design intent and build reality, and means integration issues are caught and resolved early rather than during commissioning at your site.
Mechanical assembly
Thermal modelling
Subsystem integration
Cabling & routing
Electronics
Software
Documentation
Certification
02
System verification
Before any acceptance test, we run a full internal verification campaign. Every functional requirement is exercised and measured — motion performance, repeatability, thermal behaviour, load capacity and software state machines.
Where applicable we use hardware-in-the-loop setups to validate control software against the real plant before the machine runs at full load. This eliminates the risk of discovering software issues late in the test campaign, when they are most expensive to fix.
Functional testing
Performance measurement
Repeatability testing
Thermal validation
Hardware-in-the-loop
03
Factory acceptance testing
The FAT is conducted at our facility with you present. We run the machine through its full operating envelope — all modes, edge cases and safety functions — against the agreed acceptance criteria. Every test result is documented in a formal test report.
After delivery and installation, we perform the site acceptance test at your location. The SAT confirms that transport and installation have not affected machine performance, and that the system meets specification in its operational environment.
FAT
SAT
Acceptance criteria
Test report
04
Commissioning & handover
Our engineers are onsite for installation and commissioning. We bring up all subsystems in a controlled sequence, tune the control loops in the real environment and verify that the machine performs to specification under production conditions.
Commissioning ends with a structured handover: we walk your operators and maintenance team through the machine, transfer all documentation — including drawings, software, test reports and manuals — and make sure your team is confident running it independently.
Onsite installation
Control loop tuning
Operator training
Documentation
Validation
What we deliver
Assembled & tested machines
Test setups
Tooling
FAT report
SAT report
As-built documentation
Software package
Operator manual
Maintenance manual